Skip to main content

ACTION: Conserve Energy to Help Restore Power to Customers

Published Feb 16, 2021 by A.J. Mistretta

why-houston

Call to Action from the Greater Houston Partnership:

The greater Houston area, as well as virtually the entire state of Texas, has been impacted by the extreme weather event over the last two days, which has resulted in widespread and continuing large-scale power outages. Because of a continuing shortage of power supply (i.e., generation) on the Texas (ERCOT) grid, combined with high customer load related to the low temperatures, ERCOT has called for significant power curtailments to balance electricity supply and demand. These curtailments are executed by local power distribution companies (e.g. CenterPoint Energy). Because of the prolonged character of this weather event, these curtailments (outages) are lasting longer than traditional rolling-blackouts used to shave peak on some very hot summer days.

As a result, ERCOT and local and state elected officials have issued a call for energy conservation.

The less power each of us uses, the more power is available to distribute to more homes – i.e., fewer customers must be curtailed.

For residential customers who have electricity, we encourage you to help conserve energy by taking the following steps:

  • Turn down thermostats to 68 degrees or lower;
  • Open blinds and shades to take advantage of the sun’s natural heat during the day;
  • Close shades and blinds at night to reduce the amount of heat lost through windows;
  • Turn off and unplug non-essential lights and appliances; and avoid using large appliances (e.g., ovens, washing machines, etc.).  

For all other electric customers (non-essential governmental entities, commercial and industrial customers, businesses, and other institutions and organizations), we encourage you to conserve power by limiting operations as much as possible and reducing electricity usage while the weather event continues.

We at the Greater Houston Partnership appreciate all that is being done – both by the electric industry and by the state’s consumers – to manage through this situation. We, like others, will be prepared for an in-depth investigation into what happened this week and what steps might be taken in the future to avoid a similar event. In the meantime, please stay safe.

Related News

Energy

International Co. Moves HQ to Houston, Announces Solar Manufacturing Plant Near Katy

8/26/24
Virginia-based TMEIC Corporation Americas has announced it will relocate its headquarters to Houston, with plans to build a solar manufacturing facility near Katy.   The company, a subsidiary of Japan’s TMEIC Corporation, will move to Houston’s Energy Corridor in March 2025, while maintaining an office in Roanoke, Virginia. TMEIC will also launch a state-of-the-art photovoltaic (PV) manufacturing facility in Brookshire. The 144,000-square-foot facility, expected to open in October, will be located near its existing power supply and medium voltage drive manufacturing plant in Katy. Initially, the facility will have the capacity to produce 9 GW annually, with potential for future expansion. The facility is projected to create up to 300 jobs.   "We are excited to make these investments for an expanded presence in the Houston area with the relocation of our headquarters and the opening of our new manufacturing facility,” said Manmeet S. Bhatia, President and CEO of TMEIC Corporation Americas, in a statement. “This strategic expansion underscores TMEIC's dedication to the renewable energy industry, advancing clean energy technology, maintaining strong client relationships, and competing on a global basis while proudly manufacturing in the United States.”    The Greater Houston Partnership played a pivotal role in attracting TMEIC to the region, working actively to bring solar energy companies to Houston.    This announcement underscores Houston's growing prominence as a leader in solar energy. According to the Clean Investment Monitor, Texas attracted over $12 billion in solar investments in 2023. As a pivotal player in the global energy transition, Houston has been at the forefront of this growth, establishing itself as a prime destination for solar manufacturing companies seeking expansion.  For instance, Renewable Parts, a company specializing in wind turbine supply chain and refurbishment, chose Humble for its new parts recirculation workshop. Similarly, international companies Triveni Turbines and Imperial Star Solar have also unveiled plans for new solar manufacturing facilities in the Houston area.  Learn more about Houston’s leadership in solar energy. 
Read More
Energy

Jupiter Power announces commercial operations of 400MWh of dispatchable power in Houston and continued investment in Texas

8/20/24
[PRESS RELEASE] - Jupiter Power LLC ("Jupiter Power") announced today the achievement of commercial operations of 400MWh of dispatchable power to the ERCOT grid from its Callisto I battery energy storage facility in Houston, Texas. This new facility, which will significantly increase Houston's supply of reliable, zero emissions power as it faces record demand increases, is a product of the market-based improvements by lawmakers in recent years to add competitive dispatchable power to the ERCOT grid.   The Callisto I Energy Center is a 200MW/400MWh battery energy storage system located in central Houston, five miles from the Medical Center and ten miles from the Houston Ship Channel at the site of a former HL&P H.O. Clarke fossil fuel power plant. The site can accommodate an additional 400MW/800MWh of battery energy storage generation. "Jupiter couldn't be prouder about bringing the Callisto I project online," said Andy Bowman, Chief Executive Officer of Jupiter Power. "This project responds to lawmakers' calls to increase affordable and dispatchable new generation in an area where people need more power. Callisto I is the first energy storage project at this scale in the City of Houston and will help meet Houston's growing power needs while also increasing resiliency from extreme weather events." Callisto I represents Jupiter Power's expansion of large-scale operational battery energy storage projects outside of West Texas and into Houston, to provide the city with clean, resilient and emissions-free power.  "The announcement of Jupiter Power's Callisto I Energy Storage project is significant and exciting for the region, as it's the first large-scale transmission-connected energy storage project in the City of Houston. This critical project will help address peak power demand and is another great example of our region's leadership in scaling and deploying impactful solutions for an all the above energy future," said Jane Stricker, Greater Houston Partnership, Senior Vice President and Houston Energy Transition Initiative (HETI) Executive Director. "It is essential that Texas has a diversified generation portfolio," said State Senator Charles Schwertner, Chairman of the Senate Committee of Business and Commerce, "Batteries play an important role within that portfolio to help address demands in times of need." Jupiter Power is a developer, owner, and operator of stand-alone, grid-connected battery energy storage projects that was founded in 2017. Callisto I is Jupiter's ninth project in ERCOT, bringing its total ERCOT fleet to 1,375MWh. In December of 2023, Jupiter Power announced the closing of a $65.2 million financing with First Citizens Bank to finance the construction of Callisto I.   Media Contact Caitlin Smith (832) 326-1238 Caitlin.Smith@JupiterPower.io Media@JupiterPower.io
Read More

Related Events

Economic Development

Future of Global Energy Conference Presented by Shell USA, Inc.

Join us at the annual Future of Global Energy Conference, presented by Shell USA, Inc. and hosted by the Greater Houston Partnership, Houston Energy Transition Initiative (HETI), and the Center for Houston's Future.…

Learn More
Learn More
Executive Partners